Solar panel prices have been continuously declining recently, and many factory owners are eager to try. But I want to remind everyone: you can install it, but you must calculate the numbers clearly.
Last year, a friend installed solar PV at their factory, only to discover that annual power generation was 30% lower than expected, extending the investment payback period from 5 to 8 years.
Today, let’s discuss how to calculate the economics of factory rooftop solar.
How to Calculate Investment Costs
System Cost Breakdown
| Component | Proportion | Unit Price Reference |
|---|---|---|
| PV modules | 45-50% | 1.2-1.5 RMB/W |
| Inverters | 10-12% | 0.3-0.5 RMB/W |
| Mounting system | 8-10% | 0.2-0.3 RMB/W |
| Cables and distribution | 5-8% | 0.15-0.2 RMB/W |
| Installation labor | 10-15% | 0.3-0.5 RMB/W |
| Others | 10-15% | - |
2024 Mainstream Price: 3.0-3.5 RMB/W (turnkey price)
Capacity Calculation Formula
Formula:
Installed capacity (kWp) = Usable roof area (m²) × 100-120W/m² × efficiency factor
Example: 10,000m² roof, effective area 8,000m²
8,000 × 110 × 0.85 = 748kWp (approximately 750kWp)
How to Calculate Returns
Power Generation Estimation
Annual Power Generation Formula:
Annual generation = Installed capacity × annual equivalent full-load hours
Annual Equivalent Full-Load Hours by Region:
| Region | Hours |
|---|---|
| Category I resource area (Tibet, Qinghai) | 1600-2000h |
| Category II resource area (Gansu, Ningxia) | 1300-1600h |
| Category III resource area (Shandong, Henan) | 1000-1300h |
| Category IV resource area (Sichuan, Hubei) | 800-1000h |
Example: 750kWp installation in Category III region
750 × 1100 = 825,000 kWh/year
Revenue Composition
| Revenue Source | Calculation Method |
|---|---|
| Electricity savings | Generation × electricity price |
| Feed-in revenue | Excess electricity × feed-in price |
| Subsidy benefits | Local policy |
Using Category III region as example:
- Annual generation: 825,000 kWh
- Self-consumption ratio: 70% (577,500 kWh)
- Grid feed-in ratio: 30% (247,500 kWh)
- Electricity price: 0.6 RMB/kWh
- Feed-in price: 0.35 RMB/kWh
- Annual revenue: 577,500 × 0.6 + 247,500 × 0.35 = 447,000 RMB
Investment Return Analysis
Static Payback Period
Formula:
Static payback period = Total investment ÷ Annual revenue
Example:
- Total investment: 750kWp × 3.2 RMB/W = 2.4 million RMB
- Annual revenue: 447,000 RMB
- Static payback period: 2,400,000 ÷ 447,000 = 5.4 years
Considering Degradation
PV module degradation规律:
- Year 1: 2-3%
- Subsequent years: 0.5-0.7% annually
Revenue after 10 years:
First year revenue × (1 - average annual degradation)^10
Calculating for 10 years:
- Total revenue over 10 years: approximately 3.8 million RMB
- After deducting investment: 3.8 - 2.4 = 1.4 million RMB
- Actual IRR: approximately 8-10%
Which Factories Are Suitable
Suitable Factories
- Large roof area - Above 5,000m²
- Clear property rights - Self-owned factory, no disputes
- High electricity consumption - Annual electricity bills above 1 million RMB
- Mainly daytime usage - Solar generation matches electricity usage periods
- Local subsidies available - Regional subsidy policies
Not Suitable Factories
- Old roof structure - Requires significant reinforcement
- Mainly nighttime electricity usage - Solar generation cannot be used
- Long-term shading on roof - Trees, building shading
- Unstable lease terms - Landlord may change
- Very cheap electricity prices - Investment return takes too long
Pitfall Prevention Guide
Common Schemes
- Exaggerating power generation - Claiming 1500h/year actual only 1000h
- Low-bidding with inferior materials - Using substandard components
- Hidden O&M costs - Free O&M for first few years, then high fees
- Lack of installation qualifications - Non-professional team construction
Selection Recommendations
Module Brands:
- Tier 1: LONGi, Trina Solar, Jinko Solar
- Tier 2: Canadian Solar, Risen Energy
- Avoid: Unknown brands, low-priced Grade B panels
Inverter Brands:
- Huawei, Sungrow, GoodWe
- Focus on: Conversion efficiency, after-sales service
Installers:
- Check past projects
- Verify qualification certificates
- Clarify warranty period
Implementation Process
6 Steps
- Roof assessment - Structural load capacity, shading conditions
- Demand calculation - Electricity consumption, installation capacity
- Proposal comparison - Compare 3-5 quotations
- Contract signing - Clarify rights and responsibilities
- Construction and installation - Supervise construction quality
- Grid connection acceptance - Handle grid connection procedures
Grid Connection Application
Required Materials:
- Property certificate
- Business license
- Roof structure diagram
- Electrical single-line diagram
- Investor information
Processing Department: Local power grid company business hall
Summary
Factory rooftop solar is worth installing, but you must calculate the numbers clearly.
Key Points:
- Investment payback period 5-7 years, IRR approximately 8-10%
- Suitable for factories with high electricity consumption and daytime usage
- Choose tier-1 brands and professional installers
- Calculate power generation clearly before deciding
Solar is a good project, but don’t rush in without thinking it through.